J M Brown Ltd were instructed to carry out line marking works to a newly refurbished car park, following the installation of a new waterproof deck and anti-skid surface coating. The resurfacing works provided a durable and safe finish to the car park, and the line marking phase was required to clearly define parking areas and improve traffic flow throughout the space.
The team carefully set out and demarcated the parking bays, ensuring the layout made the most efficient use of the available space while maintaining clear and accessible parking areas. Precise measurements and positioning were used to ensure all bays were evenly spaced and compliant with the required layout for safe vehicle use.
In addition to the bay markings, J M Brown Ltd also carried out the installation of traffic directional arrows to guide vehicles safely around the car park. These markings help improve navigation within the space, reduce the risk of congestion and ensure a clear flow of traffic for both drivers and pedestrians using the facility.


















